Skip to content
Lift Maintenance CompaniesGet a quote
Menu

Lift modernisation and refurbishment

Modernisation replaces the parts that make a lift work while keeping the shaft and structure. The price depends on what is replaced and the number of floors, so it is quoted after a survey.

Older lift doors on a landing in a residential block

This is for you if

  • Parts are getting hard to find and faults keep returning
  • The examination report keeps flagging the same items
  • The lift car looks tired and you want it refitted

Look elsewhere if

When it is time to look at modernisation

Most people assume a lift needs replacing when it starts to fail. In a lot of cases it doesn't. The shaft, the guide rails and the car frame can last for decades, while the controller, the drive and the door equipment wear out or become hard to source.

Are you seeing the same faults every few months, or being told a part is no longer made? Those are the usual signs. So is an examination report that flags the same items year after year.

Modernisation and refurbishment are different jobs

The words get used as if they mean the same thing. They don't, and it helps to be clear before you ask for prices.

  • Modernisation replaces working parts: the controller, the drive or hydraulic power unit, door operators, safety gear and the alarm.
  • Refurbishment is mainly what people see: car walls, ceiling and lighting, flooring, the button panels and landing door finishes.

Many projects do some of both. If you only refit the car, the lift will look new but break down just as often.

Which standards come into it

Two pieces of the rulebook matter here. The first is BS EN 81-80, the British and European standard for improving the safety of existing passenger and goods passenger lifts. A good survey uses it to list the gaps between your lift and current practice and to say which ones the work will close.

The second is the Lifts Regulations 2016, which cover lifts placed on the market. If the work is so extensive that it amounts to a new lift, the installer has to meet those regulations and the conformity steps that go with them. Ask each company how they see your project.

Planning a lift upgrade for next year’s budget? Ask for a survey and a price for the work.

Get a quote

Blocks of flats and leaseholders

If you manage a block with long leases, the cost will usually come through the service charge, if the lease allows it. Before major works where any one leaseholder would pay more than £250 (the threshold set by SI 2003/1987, reg 6), the landlord has to consult them under section 20 of the Landlord and Tenant Act 1985.

It's very important to start that early. Consultation runs to set stages, and if it is skipped, the amount each leaseholder can be charged is limited unless a tribunal agrees to waive the requirement.

Planning for the time without a lift

The lift will be out of use for weeks, not days, on most projects. Think about residents who cannot manage stairs, deliveries and anyone with a care visit. In buildings with two lifts, doing one at a time keeps a lift running throughout.

Afterwards, the lift needs a thorough examination before it carries people, and a maintenance contract to keep the new parts in good order.

How a modernisation project runs

  1. Condition survey

    Each part of the lift is assessed, with the safety gaps against the existing-lift standard listed.

  2. Scope and quotes

    Decide what is replaced and what stays, then ask two or three companies to price the same scope.

  3. Consult and plan

    Consult leaseholders where the lease requires it, and plan for the weeks the lift is out of use.

  4. Works and handover

    Installation, testing, a thorough examination and the lift back on a maintenance contract.

Questions about modernising a lift

What is the difference between modernisation and refurbishment?

Modernisation replaces the working parts, such as the controller, drive and door equipment. Refurbishment is mostly what passengers see: the car interior, lighting, finishes and landing doors. Many projects do some of each.

How long will the lift be out of service?

It depends on how much is replaced and the number of floors. Ask each company for a programme in weeks, and plan for residents or staff who cannot use the stairs before work starts.

Will the modernised lift meet current standards?

Not automatically. BS EN 81-80 is the standard used to find and rank the safety gaps in an existing lift, and the survey should say which gaps the work will close. Where the work amounts to a new lift, the Lifts Regulations 2016 apply.

Can leaseholders be charged for a new lift?

If the lease allows it, usually yes, through the service charge. Before major works where any one leaseholder would pay more than £250 (the threshold in SI 2003/1987, reg 6), the landlord has to consult under section 20 of the Landlord and Tenant Act 1985.

Should we modernise or replace the lift completely?

If the shaft, guide rails and car frame are sound, modernising the moving parts is often enough. If the structure is the problem, or the lift is too small for the building’s needs, full replacement may be the better money.

Does the maintenance contract continue during the works?

Usually the lift comes off the contract while it is out of service and goes back on, often with the installer, once it is handed over. Agree this in writing at the start.

Ask for a lift maintenance quote

We find a lift maintenance company that covers your building and give you their name before any of your details go to them. It costs you nothing.

  1. You tell us where the building is and what the lifts need.
  2. We name a company that covers your area and ask whether you want to hear from them.
  3. If you say yes, they arrange a survey of the lifts and send a written price.
Step 1 of 3
Where is the building?
Get a quote